Know how many years until a site can actually get power, before you commit.

Independent, sourced diligence on power timing, local approval, and water rights for any U.S. data center parcel.

Sample reportReport ID 26-0812-A ยท Method v1.4
Parcel
Example County, TX
Likely time to power (P50)
34months
Conservative case (P90)
51months
Local approval
Elevated risk
Water rights
Transferable, senior priority
VerdictInvestigate further

Every report is stamped with an ID and method version so results can be reproduced and audited.

01

The three constraints

A data center site fails on one of three things. We report all three from the primary record.

Power

Your position in the interconnection queue, the headroom at the serving substation, and the upgrade schedule that actually gates energization. We translate that into a realistic range of months to energization rather than a utility's stated intent.

Water

Priority date and seniority of the rights attached to the parcel, and whether they are legally transferable from agricultural to industrial use in that state's regime. We separate paper rights from physically available supply in a constrained basin.

Permission

The jurisdiction's actual decision record, what it has approved, denied, and deferred, plus live state legislation and any moratorium in force or proposed. Stated policy matters less than the pattern of votes.

02

What you receive

Not a dashboard or a subscription to software. A sourced evidence file on one location, written to be read by an investment committee and defended line by line.

What the scan returns
  • Power signal

    The serving electric utility, the relevant ISO or RTO, and the state large load interconnection rule with its MW threshold.

  • Local approval

    Whether the location sits in an incorporated city or unincorporated county, which body holds zoning authority over land use, and any data center specific ordinance on the books.

  • Moratorium flag

    Any active or proposed moratorium or large load restriction at the state, county, or municipal level.

  • Water

    The water rights regime that governs the location and the groundwater conservation district, where one exists.

  • Reasoning

    The one thing a developer should worry about most here, and what to verify next.

Resolves to one of three verdicts
  • Proceed
  • Investigate further
  • Walk away
Standing rules of the file
  1. 01Every claim carries the document it came from, the page it appears on, and the date it was retrieved.
  2. 02Every claim carries source strength (strong, moderate, weak), meaning how authoritative the source is.
  3. 03Every report states what new evidence would change the verdict.

Decision support for diligence. Not a guarantee, and never presented as one.

03

Sample from a real Bucks County scan

Rows taken from an actual Bucks County, Pennsylvania scan. Fields are left blank where the source did not state them. Real files run considerably longer.

ClaimSource documentPageRetrievedSource strengthRefresh cadence
Serving electric utility for the parcel is PECO Energy, an Exelon operating companyPECO Energy service territory record, ExelonNot statedNot statedStrongQuarterly
The location sits inside the PJM Interconnection footprint, so large load interconnection runs through PJM processPJM Interconnection territory and member utility listingNot statedNot statedStrongQuarterly
Pennsylvania PUC issued a large load model tariff on May 12 2026Pennsylvania Public Utility Commission, Docket No. M-2025-3054271Not stated2026-05-12StrongMonthly
Middletown Township has a data center ordinance in progress and not yet adoptedMiddletown Township, Bucks County, ordinance in progressNot statedNot statedModerateWeekly
Groundwater withdrawals above 100,000 gallons per day require DRBC review in the Southeastern Pennsylvania Groundwater Protected AreaDelaware River Basin Commission, Southeastern Pennsylvania Groundwater Protected Area rulesNot statedNot statedStrongQuarterly

Snapshot ID and model version are stamped on every report, so a changed score always resolves to either a changed record or a changed method.

04

National status map

Where the legislative and moratorium picture stands, by state. Select a state for detail.

AKMEVTNHWAIDMTNDMNILWIMINYRIMAORNVWYSDIAINOHPANJCTCAUTCONEMOKYWVVAMDDEAZNMKSARTNNCSCDCOKLAMSALGAHITXFL
Moratorium statusNoneProposedActiveNo data on file

State level view, directional only. Parcel level analysis is delivered as a report.

05

Pricing

The scan is free and requires no account. Paid tiers cover the full evidence file and ongoing monitoring.

Billing

Scan

Freeno login required

A preliminary read on any U.S. site, by request. No login.

  • Instant preliminary read on any US site
  • Power signal, local approval status, moratorium flags, water
  • Reasoning and a verdict
  • No login

Professional

Most used
$500per month

The full sourced evidence file, per site, with monitoring.

  • Everything in Scan
  • Full sourced evidence file per site, verified and written for an investment committee
  • Site Watch: we re-check each saved site on a schedule and email you the moment a bill, ordinance, moratorium, or queue change appears (rolling out)
  • Watchlist dashboard: every site you track on one screen with a live status and last-changed date (rolling out)
  • Site Compare: score two to five sites side by side and rank them
  • Approval track record: how the jurisdiction has actually voted on past data-center applications
  • Change history: a timestamped, sourced log of every status change on your sites
  • Up to 3 full analyses per month

Items marked rolling out are being built with our first customers.

Enterprise

From $2,000per month, custom

Portfolio scale coverage, integration, and turnaround.

  • Everything in Professional
  • API access: Estrify data flows directly into your own systems and tools (rolling out)
  • Portfolio monitoring: every site in your pipeline watched at once, with a weekly digest (rolling out)
  • Unlimited high-volume analyses
  • Priority turnaround on deep verified reads
  • White-label and reseller: deliver Estrify reads under your own brand to your own customers (rolling out)
  • A named analyst and direct founder access

Items marked rolling out are being built with our first customers.

07

Where this has been wrong

Published misses, not selected wins.

DateJurisdictionEstrify saidOutcome
No resolved outcomes recorded yet.

This table fills in as our published calls resolve, including the misses. A risk assessment that has never been checked against reality is a marketing asset, not a risk assessment.