Back to map
State record

Texas

Moratorium status
none
Active bills
1
Water regime
prior appropriation (surface), rule of capture (groundwater)
Last reviewed
2026-08-18

SB 6 (2025) created a new interconnection process for large loads of 75 MW and above. Smaller loads fall below that threshold.

State level view, directional only. Parcel level analysis is delivered as a report.